Renovating redundant power supplies donated to the UK Labaid charity before sending to African schools.

The power supplies have been received then checked over and modified to make them appropriate and safe for future use within schools.

Step 1

Looking for signs of damage such as over heating or effect of damp.

Step 2

The power supplies origonally had a remote control via IR which did not work as the transmitters were not working. The voltage display was not working so the printed circuit was removed

Step 3

Transformer voltages and leads were checked prior to reassembly and the Variac which adjusted the voltage had a carbon brush which was lubricated with WD40

Step 4

The front panel wis drilled to take a thermal cutout to limit the output current as the old PCD had included this protection. The case was cleaned with acetone to remove old markings which were not relevant

Step 5

The voltage was checked and labels added to show output voltage. The thermal cutout was tested by shorting the output.

Step 6

Following the PAT test the supplies are ready for shipping to schools who have little or no apparatus for science experiments. I have been a volunteer with this charity since retiring.

share

Contact Us

WD-40 Company Ltd 252 Upper Third Street Milton Keynes MK9 1DZ

© 2024 WD-40 Company. All Rights Reserved

Sign In đź‘‹

---------- Or ----------

Forgot password?

Need an account? Sign up for free.

Forgot password?

Not a problem. Enter your email address below and we will send you a link to reset it.

Cancel

Create Account

Cancel